AI that finds the best sites
for data center construction,
then agentically takes the first steps to build.

Atlaxos scans power, fiber, land, and regulatory fit across every U.S. county to surface the highest-potential sites, then initiates outreach, utility pre-applications, and regulatory groundwork on your behalf.

See Sample Results →
check_circle Precision analysis
verified_user Risk mitigation
gavel Regulatory clarity
smart_toy Agentic action

Sample Greenfield Opportunity Analysis (Virginia)

High-fidelity suitability assessment for emerging data center hubs.

See Results →

Virginia, USA

Augusta County

91/100 High Suitability
0 Existing Data Centers

Why Build Here

Dual Dominion + AEP utility territory with two independent power paths. County actively drafting a dedicated data center ordinance. 500+ acres of pre-cleared industrial land at the Shenandoah Valley Industrial Center.

Risk Factors

  • Ordinance not yet finalized; first application may face process uncertainty
  • AEP side has historically lower spare transmission capacity than Dominion

Agent Actions

Virginia, USA

Montgomery County

76/100 High Suitability
0 Existing Data Centers

Why Build Here

Virginia Tech Internet2 node provides high-capacity research network access. Lowest LMP energy pricing in Virginia (~4.9¢/kWh). High elevation and cool climate reduce cooling costs year-round.

Risk Factors

  • No DC zoning ordinance yet; county must act before permitting can begin
  • AEP transmission capacity requires new infrastructure for hyperscale loads

Agent Actions

Virginia, USA

Brunswick County

82/100 High Suitability
0 Existing Data Centers

Why Build Here

Southern terminus of PJM-approved $4.8B HVDC transmission line delivering 3,000MW by 2032. Rural land at ~$8–12K/acre with tobacco-region incentives and no competing data center presence.

Risk Factors

  • HVDC converter station completes June 2032; 6-year infrastructure lead time
  • No existing DC ordinance; first application will set precedent

Agent Actions

Signals Analyzed

Our engine scours nine signal layers, from power interconnection queues to community sentiment, and evaluates each location across 44 site-specific variables to surface the highest-potential sites.

bolt Power
settings_input_component Fiber
map Land
gavel Regulatory
thermostat Climate
groups Labor
water_drop Water
local_shipping Logistics
sentiment_satisfied Sentiment
add Custom APIs

Agentic Actions: what AI does after analysis

mail

EDA Outreach

Draft and send introductory letters to county economic development authorities.

bolt

Utility Pre-Application

Initiate interconnection queue filings and pre-application inquiries with the relevant utility.

description

Zoning Checklist

Generate a site-specific checklist of permits, variances, and ordinance requirements.

schedule

Milestone Tracking

Monitor regulatory filings, utility timelines, and ordinance progress automatically.

01

Scan

Scan every county across the U.S. across power, fiber, land, incentives, labor, transmission, and more.

02

Score

Each county scored across six infrastructure dimensions, including energy, connectivity, regulatory climate, incentives, and water access, then ranked by suitability.

03

Analysis

A ranked analysis with scored signals, cited sources, and recommended first actions for each county.

04

Act

AI agents draft your EDA outreach, initiate utility pre-applications, generate zoning checklists, and track regulatory milestones, moving from analysis to groundbreaking.

security

"Data is synthesized from utility interconnection queues, municipal zoning records, and real-time PJM transmission expansion plans."

Atlaxos: Data Center Site Intelligence