AI that finds the best sites
for data center construction,
then agentically takes the first steps to build.
Atlaxos scans power, fiber, land, and regulatory fit across every U.S. county to surface the highest-potential sites, then initiates outreach, utility pre-applications, and regulatory groundwork on your behalf.
Sample Greenfield Opportunity Analysis (Virginia)
High-fidelity suitability assessment for emerging data center hubs.
Virginia, USA
Augusta County
Why Build Here
Dual Dominion + AEP utility territory with two independent power paths. County actively drafting a dedicated data center ordinance. 500+ acres of pre-cleared industrial land at the Shenandoah Valley Industrial Center.
Risk Factors
- Ordinance not yet finalized; first application may face process uncertainty
- AEP side has historically lower spare transmission capacity than Dominion
Agent Actions
Virginia, USA
Montgomery County
Why Build Here
Virginia Tech Internet2 node provides high-capacity research network access. Lowest LMP energy pricing in Virginia (~4.9¢/kWh). High elevation and cool climate reduce cooling costs year-round.
Risk Factors
- No DC zoning ordinance yet; county must act before permitting can begin
- AEP transmission capacity requires new infrastructure for hyperscale loads
Agent Actions
Virginia, USA
Brunswick County
Why Build Here
Southern terminus of PJM-approved $4.8B HVDC transmission line delivering 3,000MW by 2032. Rural land at ~$8–12K/acre with tobacco-region incentives and no competing data center presence.
Risk Factors
- HVDC converter station completes June 2032; 6-year infrastructure lead time
- No existing DC ordinance; first application will set precedent
Agent Actions
Signals Analyzed
Our engine scours nine signal layers, from power interconnection queues to community sentiment, and evaluates each location across 44 site-specific variables to surface the highest-potential sites.
Agentic Actions: what AI does after analysis
EDA Outreach
Draft and send introductory letters to county economic development authorities.
Utility Pre-Application
Initiate interconnection queue filings and pre-application inquiries with the relevant utility.
Zoning Checklist
Generate a site-specific checklist of permits, variances, and ordinance requirements.
Milestone Tracking
Monitor regulatory filings, utility timelines, and ordinance progress automatically.
Scan
Scan every county across the U.S. across power, fiber, land, incentives, labor, transmission, and more.
Score
Each county scored across six infrastructure dimensions, including energy, connectivity, regulatory climate, incentives, and water access, then ranked by suitability.
Analysis
A ranked analysis with scored signals, cited sources, and recommended first actions for each county.
Act
AI agents draft your EDA outreach, initiate utility pre-applications, generate zoning checklists, and track regulatory milestones, moving from analysis to groundbreaking.
"Data is synthesized from utility interconnection queues, municipal zoning records, and real-time PJM transmission expansion plans."
Atlaxos: Data Center Site Intelligence